Guardrail installation varies by type (e.g., highway W-beam vs. pedestrian railings), but the general process follows these key steps:
1. Planning & Compliance Check
Survey the site (road curvature, slope, traffic conditions).
Verify standards (MASH, AASHTO, OSHA, or local codes).
Mark layout (post spacing, rail height, and termination points).
2. Post Installation
For Highway Guardrails (W-Beam, Thrie-Beam, Cable):
Dig post holes (typically 24–30 inches deep).
Set posts (wood, steel, or concrete) at specified spacing:
W-beam: 6 ft 3 in (1.9 m) standard.
Thrie-beam: Up to 6 ft (1.8 m).
Cable barriers: 12.5–20 ft (3.8–6 m).
Backfill with concrete or compacted soil for stability.
For Pedestrian/Industrial Guardrails:
Anchor posts to concrete floors, walls, or steel structures.
Use base plates or embedded sleeves for rigidity.
3. Rail Assembly & Attachment
A. W-Beam & Thrie-Beam Guardrails
Attach rails to posts using bolted blockouts (for deflection).
Overlap rail sections (minimum 12 inches for continuity).
Install end terminals (energy-absorbing or flared for safety).
B. Cable Guardrails
String high-tension steel cables through posts.
Anchor cables at terminal ends with breakaway hardware.
C. Concrete Barriers (Jersey Barriers)
Precast segments are delivered and aligned.
Connected with rebar or pins for stability.
4. Termination & Impact Protection
End treatments (ET-Plus, MELT, or flared) to prevent spearing.
Crash cushions (if near fixed objects).
5. Inspection & Testing
Check post alignment, rail height, and bolt tightness.
Verify crashworthiness (for highway guardrails per MASH standards).
Ensure no hazardous gaps (e.g., OSHA’s 19-inch rule for workplaces).
Key Tools & Materials
Excavator / Auger (for post holes).
Torque Wrench (for bolt tightening).
Guardrail panels, posts, blockouts, terminals.